The surrounding public realm is currently shaped by bin storage and the TfL cycle hire station, with limited greenery, seating or active frontage. There is an opportunity to create a more welcoming setting that better celebrates the neighbouring Grade I listed St Peter’s Church and strengthens its relationship with the wider area. At ground-floor level, there is also potential to improve the building’s relationship with the street, introducing greater activity and natural surveillance and creating a more welcoming environment throughout the day.
Following earlier proposals for the site, the new ownership team has worked closely with a specialist design team and planning officers to bring forward a revised approach. This retains around 40% of the existing structure and more than 60% of the existing façade, combining sensitive refurbishment with a carefully considered extension. The proposals retain key elements of the existing façade while creating while creating a high-quality, modern workplace that is more in keeping with the character of the conservation area.
Alongside the main planning application, a separate application will also be submitted for a limited programme of works to the existing building. This would provide an alternative approach should any constraints prevent the wider proposals from being delivered. These works would be limited in scope and focus on improvements to the existing building, including upgrades to end-of-trip facilities, building management arrangements and the existing rooftop amenity space.















St Peter’s Church is Grade I listed, yet its current setting is compromised by the surrounding environment and the existing building. The proposals seek to enhance its setting by creating a more coherent and respectful backdrop, improving views and strengthening its presence within the townscape.
The proposals retain key elements of the existing heritage façade while creating a contemporary building suited to Westminster’s evolving Central Activities Zone. The design carefully balances the retained fabric with a considered new extension, creating a coherent architectural approach that responds to the surrounding townscape and provides an appropriate backdrop to the neighbouring church.
The scale and massing have been carefully developed in response to neighbouring buildings and the wider context. The lower levels of the new façade relate closely to the retained heritage façade, while the southern elevation steps down towards Oxford Street in acknowledgement of the lower-rise character along the street. The massing also steps down towards Vere Street, providing a considered transition between One Chapel Place and the existing city block, while helping to complete and clearly define the edges of the square.
The proposals will deliver high-quality, flexible and affordable workspace designed to meet the needs of a range of occupiers in one of London’s most dynamic commercial districts. External amenity, including a green rooftop terrace, will provide attractive outdoor space for occupiers, supporting a modern, sustainable and high-quality workplace for the future.
The proposals provide an opportunity to create a greener, more welcoming and active public realm around One Chapel Place and St Peter’s Church.
This will create a more attractive place for people to move through, pause and spend time, while offering a moment of respite just off Oxford Street.

